左宽

右宽

总宽

1

40.154

39.540

0.614

15

15

30

18.42

2

40.186

39.640

0.546

15

15

30

20

16.38

17.4

0.00

348.00

3

40.244

39.635

0.609

15

15

30

20

18.27

17.325

0.00

346.50

4

39.534

39.630

0.096

15

15

30

20

2.88

7.695

0.00

153.90

5

39.557

39.575

0.018

15

15

30

20

0.54

1.71

34.20

6

40.804

39.520

1.284

15

15

30

20

38.52

18.99

0.00

379.80

7

40.800

39.590

1.21

15

15

30

20

36.3

37.41

0.00

748.20

8

40.922

39.590

1.332

15

15

30

20

39.96

38.13

0.00

762.60

9

41.154

39.590

1.564

15

15

30

20

46.92

43.44

0.00

868.80

10

41.367

39.590

1.777

15

15

30

20

53.31

50.115

0.00

1002.30

11

41.152

39.590

1.562

15

15

30

20

46.86

50.085

0.00

1001.70

12

40.916

39.590

1.326

15

15

30

20

39.78

43.32

0.00

866.40

13

40.757

39.590

1.167

15

15

30

20

35.01

37.395

0.00

747.90

14

41.201

39.590

1.611

15

15

30

20

48.33

41.67

0.00

833.40

15

41.332

39.590

1.742

15

15

30

20

52.26

50.295

0.00

1005.90

16

41.867

39.650

2.217

15

15

30

20

66.51

59.385

0.00

1187.70

17

41.902

39.660

2.242

15

15

30

20

67.26

66.885

0.00

1337.70

11590.80

计算:                                     复核:                                  监理工程师:                          年   月   日

K0+760

K0+740

K0+720

K0+700

合计

序号

现状高程

设计高程

挖填高度

距离

K0+880

K0+860

K0+840

K0+820

K0+800

K0+780

K1+000

K0+980

K0+960

K0+940

k0+040

K0+900

峨眉路土方工程量表

设计主路宽度

断面积(m2)

平均面积(m2)

土方数(m3)

K1+020

备注

桩号

第 1 页,共 1 页

Logo

DAMO开发者矩阵,由阿里巴巴达摩院和中国互联网协会联合发起,致力于探讨最前沿的技术趋势与应用成果,搭建高质量的交流与分享平台,推动技术创新与产业应用链接,围绕“人工智能与新型计算”构建开放共享的开发者生态。

更多推荐